| Location | Maple Plain, Minnesota, USA |
| Project Type | Golf Clubhouse & Hospitality Facility |
| Building Height | Single Story |
| Approximate Area | 20,000 – 25,000 SF |
| Client Type | MP Contractor |
| BIM Level | LOD 300 – LOD 400 |
| Services | Laser Scan to BIM, HVAC System Installation, BIM Coordination |
| Software | Autodesk Revit, Navisworks, AutoCAD |
Existing Facility Constraints
Integrating modern HVAC systems within an operational clubhouse while minimizing disruption to facility operations.
Complex Roof Structure
Large-span roof systems, vaulted ceilings, exposed structural elements, and varying roof elevations complicated duct routing.
Accurate Existing Conditions Capture
Capturing hidden elements required extensive scanning and point cloud validation.
Limited Mechanical Space
Routing ductwork through constrained ceiling cavities and occupied areas required careful planning.
Multi-Discipline Coordination
Coordination between Architecture, Structure, and Mechanical systems to eliminate clashes before construction.
Construction Documentation
Developing installation-ready drawings while maintaining constructability and accuracy.
Delivered a highly accurate Scan-to-BIM model and coordinated HVAC installation package that improved renovation planning, minimized field conflicts, enhanced stakeholder collaboration, and provided construction-ready documentation for successful project execution and future facility management.