FOUR POINTS BY SHERATON HOTEL

PDF to BIM Conversion | MEP Modeling & Construction Documentation
FOUR POINTS BY SHERATON HOTEL

PROJECT INFORMATION

Location North Carolina, USA
Project Type Hospitality / Hotel
Building Height 5 Stories
Approximate Area 75,000 – 95,000 SF
Client Type MP Contractor
BIM Level LOD 350
Services PDF to BIM, MEP Modeling, BIM Coordination
Software Autodesk Revit, Navisworks, AutoCAD

This project involved converting PDF-based Mechanical, Electrical, and Plumbing drawings into a coordinated BIM model for a Four Points by Sheraton hotel development. The scope included detailed MEP modeling, clash detection, interdisciplinary coordination, and development of construction-ready documentation to support installation and project execution.

Scope of Work

MEP BIM Modeling (LOD 350)

  • Mechanical (HVAC equipment, ductwork & ventilation)
  • Electrical (Power, lighting & cable routing)
  • Plumbing (Water supply, drainage & fixtures)

BIM Coordination

  • Architectural & Structural coordination
  • Clash detection & resolution
  • Multi-trade coordination and QA/QC

Key Deliverables

  • Coordinated MEP BIM Model (LOD 350)
  • Mechanical, Electrical & Plumbing Models
  • MEP Layout Drawings
  • Equipment Schedules
  • Clash Detection Reports
  • Construction Documentation Package
  • Navisworks Coordination Model (NWC)

Construction Documentation

  • MEP layout drawings
  • Equipment schedules
  • Sections, details & coordinated construction documents

KEY CHALLENGES

Coordinating complex MEP systems across guest rooms, public areas, and back-of-house spaces while maintaining consistency in repetitive room layouts. Limited ceiling space, PDF-based source drawings, and continuous multi-discipline coordination required accurate BIM modeling, clash resolution, and the production of construction-ready documentation.