MEDICAL SKILLS & TRAINING CENTER

PDF/CAD to BIM | MEP Modeling & Construction Documentation
This project involved converting PDF and CAD-based design documentation into a coordinated MEP BIM model for a multi-story Medical Skills & Training Center located in California, USA. The objective was to develop detailed Mechanical, Electrical, and Plumbing models to support coordination, clash detection, construction planning, and installation documentation.

PROJECT INFORMATION

Item Details
Location California, USA
Facility Type Medical Skills & Training Center
Building Height 4 Stories
Approx. Area 100,000 SF
BIM Level LOD 350
Client Type MP Contractor
Services PDF/CAD to BIM, MEP Modeling, Coordination
Software Revit, Navisworks, AutoCAD

Mechanical

  • HVAC Equipment Modeling
  • Supply, Return & Exhaust Ductwork
  • Mechanical Room Coordination
  • Equipment Schedules

Electrical

  • Lighting & Power Systems
  • Panelboards & Switchgear
  • Cable Tray & Conduit Modeling
  • Emergency Power Coordination

Plumbing

  • Domestic Water Systems
  • Sanitary & Vent Systems
  • Storm Drainage Systems
  • Plumbing Fixture Coordination

BIM Coordination

  • Multi-Discipline Coordination
  • Clash Detection & Resolution
  • Constructability Reviews
  • QA/QC Validation

Construction Documentation

  • MEP Layout Drawings
  • Coordination Plans
  • Equipment Schedules
  • Installation Details

Key Challenges

  • Integrating information from multiple PDF and CAD sources.
  • Coordinating MEP systems across four building levels.
  • Managing congested ceiling spaces and service corridors.
  • Resolving clashes between architectural, structural, and MEP systems.
  • Producing construction-ready documentation while maintaining BIM accuracy.

Deliverables

  • Mechanical BIM Model (LOD 350)
  • Electrical BIM Model (LOD 350)
  • Plumbing BIM Model (LOD 350)
  • Coordinated Federated BIM Model
  • Clash Detection Reports
  • Equipment Schedules
  • Construction Documentation Package
  • NWC/IFC Coordination Files

Value Delivered

Delivered a fully coordinated MEP BIM model that enhanced project visualization, minimized field conflicts, improved interdisciplinary coordination, and provided accurate construction-ready documentation for efficient project execution.