WINDSONG FARM CLUBHOUSE

Laser Scan to BIM | HVAC System Installation | Detailed Construction Documentation
This project involved performing a comprehensive Laser Scan to BIM workflow for the Windsong Farm Clubhouse in Maple Plain, Minnesota. The objective was to capture accurate existing conditions, develop a coordinated BIM model, and facilitate the installation of a new HVAC system. The project included reality capture, BIM modeling, HVAC coordination, clash detection, and preparation of detailed installation and construction drawings.

PROJECT INFORMATION

Location Maple Plain, Minnesota, USA
Project Type Golf Clubhouse & Hospitality Facility
Building Height Single Story
Approximate Area 20,000 – 25,000 SF
Client Type MP Contractor
BIM Level LOD 300 – LOD 400
Services Laser Scan to BIM, HVAC System Installation, BIM Coordination
Software Autodesk Revit, Navisworks, AutoCAD

Scope of Work

  • Reality Capture & Existing Conditions
  • 3D Laser Scanning of Interior & Exterior Areas
  • Point Cloud Registration & Processing
  • Existing Conditions Documentation
  • Scan Validation & Quality Control
  • Existing Architectural and Structural Verification
  • Scan to BIM Development
  • Architectural Existing Conditions Model
  • Structural BIM Modeling
  • Existing MEP System Modeling
  • Federated BIM Model Creation
  • LOD 300–400 Model Development
  • HVAC System Installation
  • Existing HVAC Assessment
  • New HVAC Equipment Placement
  • Mechanical Room Coordination
  • Supply, Return & Exhaust Duct Routing
  • HVAC System Coordination
  • Clash Detection & Resolution
  • Detailed Construction Documentation
  • HVAC Layout Plans
  • Installation Drawings
  • Reflected Ceiling Plans
  • Mechanical Sections & Details
  • Equipment Schedules
  • Coordination Drawings
  • Construction Documentation Package

Project Challenges

Existing Facility Constraints
Integrating modern HVAC systems within an operational clubhouse while minimizing disruption to facility operations.

Complex Roof Structure
Large-span roof systems, vaulted ceilings, exposed structural elements, and varying roof elevations complicated duct routing.

Accurate Existing Conditions Capture
Capturing hidden elements required extensive scanning and point cloud validation.

Limited Mechanical Space
Routing ductwork through constrained ceiling cavities and occupied areas required careful planning.

Multi-Discipline Coordination
Coordination between Architecture, Structure, and Mechanical systems to eliminate clashes before construction.

Construction Documentation
Developing installation-ready drawings while maintaining constructability and accuracy.

Deliverables

  • Registered Point Cloud Files
  • Existing Conditions BIM Model
  • Architectural BIM Model
  • Structural BIM Model
  • Mechanical BIM Model
  • Coordinated Federated BIM Model
  • HVAC Installation Drawings
  • Mechanical Layout Plans
  • Detailed Sections & Drawings
  • Equipment Schedules
  • Clash Detection Reports
  • NWC / IFC Coordination Models

Project Highlights

Maple Plain, Minnesota, USA
20,000–25,000 SF Golf Clubhouse Facility
Laser Scan to BIM Workflow
New HVAC System Installation
LOD 300 → LOD 400 Development
Detailed Construction Drawings
Multi-Discipline BIM Coordination
Construction-Ready Deliverables

Value Delivered

Delivered a highly accurate Scan-to-BIM model and coordinated HVAC installation package that improved renovation planning, minimized field conflicts, enhanced stakeholder collaboration, and provided construction-ready documentation for successful project execution and future facility management.