PLANT ROOM – CALGARY, ALBERTA, CANADA

HVAC & Plumbing BIM Modeling | Clash Coordination | Construction Documentation
This project involved the development of a highly coordinated BIM model for a central plant room serving a large commercial facility in Calgary, Alberta. The scope included detailed HVAC and plumbing modeling, multidisciplinary clash detection and coordination, construction documentation, and BIM-based visualization to support fabrication, installation, and construction activities.

PROJECT INFORMATION

Location Calgary, Alberta, Canada
Project Type Central Utility Plant Room
Client MP Contractor
Approximate Area 8,000 – 10,000 SF
BIM Level LOD 350
Services HVAC Modeling, Plumbing Modeling, Clash Coordination, Construction Documentation
Software Autodesk Revit, Navisworks Manage, AutoCAD
HVAC BIM Modeling
Plumbing BIM Modeling
Clash Detection & Coordination
Construction Documentation
BIM Quality Assurance
  • Model Validation
  • Coordination Review
  • Clash Resolution Verification
  • QA/QC Checks
  • Construction Readiness Assessment
Delivered a highly coordinated HVAC and plumbing BIM model that improved constructability, reduced field conflicts, enhanced installation efficiency, and provided accurate construction documentation to support successful project execution.

High-Density MEP Environment

Complex Piping Networks
Maintenance Accessibility
Clash Resolution
Constructability Requirements
  • Maintaining fabrication-ready model accuracy while meeting project-specific BIM standards and coordination requirements.